Projects

VELDO Technology Factory Construction

Location:

Kocaeli/Gebze (2025)

Manufacturing Type:

Reinforced Concrete

Quantity:

36.000 m²

Seat-Skoda Service Building Construction

Location:

İstanbul/Çekmeköy (2023)

Manufacturing Type:

Reinforced Concrete

Quantity:

13.000 m²

DAP Yapı Ormanköy Konut Construction

Location:

İstanbul/Çekmeköy (2021)

Manufacturing Type:

Reinforced Concrete

Quantity:

35.000 m²

Çekmeköy Tennis Academy Hotel Construction

Location:

İstanbul/Çekmeköy (2019)

Manufacturing Type:

Reinforced Concrete

Quantity:

43.000 m²

İBB Cleaning Vehicles Garage

Location:

İstanbul/Bayrampaşa (2018)

Manufacturing Type:

Reinforced Concrete

Quantity:

24.000 m²

İBB Underground Car Park Construction

Location:

İstanbul/Kağıthane (2018)

Manufacturing Type:

Reinforced Concrete

Quantity:

22.500 m²

Indoor Swimming Pool Construction

Location:

İstanbul/Kağıthane (2016)

Manufacturing Type:

Reinforced Concrete

Quantity:

18.500 m²

Yunus Textile Factory Construction

Location:

İstanbul/Tuzla (2012)

Manufacturing Type:

All manufacturing including settlement

Quantity:

6.000 m²

Ramada Encore Hotel Construction

Location:

İstanbul/Kartal (2009)

Manufacturing Type:

Reinforced Concrete + Wall + Steel Manufacturing

Quantity:

9.000 m²